Books like Critical Path
R. Buckminster Fuller
Critical Path is 471 pages, about 8 hours 38 minutes at 250 words a minute.
12 books to read next
-
A Study of History 10.6 h -
Civilization on Trial 4.8 h -
Choose Life 7.5 h -
Homo Ludens 4.3 h -
The Ascent of Man 8.2 h -
The Decline of the West 8.6 h -
The Discovery of India 10.7 h -
The Third Wave 9.9 h -
Future Shock 10.3 h -
The Lion and the Unicorn 2.3 h -
The Story of Civilization 12 min -
The Open Society and Its Enemies 13.4 h
How long each takes
A Study of History 10.6 h
Civilization on Trial 4.8 h
Choose Life 7.5 h
The Ascent of Man 8.2 h
The Decline of the West 8.6 h
The Discovery of India 10.7 h
The Third Wave 9.9 h
Future Shock 10.3 h
The Open Society and Its Enemies 13.4 h Bar height shows length. Estimated at 250 words a minute.